Machine-based wall finishing solutions
Choose by type of work, not by machine
Each solution is a set of equipment and a process the manufacturer has already combined: a machine that puts material on the wall, a machine that levels it, and the preparation and curing steps around them.
Solution 1
Automated plastering system
A robot sprays mortar up to 5.7 m, a DM machine levels it: fewer people, less climbing, clear data.
The DM-ACR-100 plastering robot maps the floor, moves on its own and sprays mortar onto walls up to 5.7 m high. The DM Leading PRO follows and levels the surface within 2 mm (manufacturer data).
-
Robot sprays mortar
-
Automatic levelling
-
Hand finishing of corners and edges
Solution 2
Spray and level plastering
A sprayer puts mortar on the wall, a DM machine levels it. The easiest pair to start with.
A PC-18 or DP-220 sprays mortar under pressure. A DM Leading PRO (or DM Leading 3.2 m) levels it automatically. According to the manufacturer, a crew of 4 covers about 800 m² per shift.
-
Spray mortar onto the wall
-
Automatic levelling
-
Hand finishing of corners and edges
Solution 3
Machine gypsum plastering
Mix and spray dry gypsum in a closed system, then level it smooth with a DM machine. Cleaner and more consistent.
A DM-MIX or D70 mixes dry gypsum with water and sprays it; a DM machine levels it automatically. According to the manufacturer, a crew of 4 covers about 800 m² per day.
-
Mix and spray gypsum
-
Automatic levelling
-
Hand finishing of corners and edges
Solution 4
Putty and paint spraying
High-pressure putty spraying over large areas, machine leveling, machine sanding. Over 1,500 m² per day according to the manufacturer.
Putty is machine-mixed, sprayed over large areas with a D836 or D976 high-pressure sprayer, leveled with a DM machine and finished with a sander. According to the manufacturer, a crew of 4 covers over 1,500 m² per day.
-
Spray putty or paint
-
Automatic levelling
-
Sanding and finishing
The 4 solutions at a glance
| Automated plastering system | Spray and level plastering | Gypsum plastering | Putty and paint spraying | |
|---|---|---|---|---|
| Best for | Large projects, factories, high lobbies up to 5.7 m | Apartments, social housing, offices, schools | Interiors and offices using gypsum plaster | Putty and paint contractors for apartments, offices, factories |
| Main equipment | DM-ACR-100 + DM Leading PRO | PC-18 or DP-220 + DM leveler | DM-MIX or D70 + DM leveler | D836 or D976 + DM leveler + sander |
| Crew (manufacturer data) | 3 people | 4 people | 4 people | 4 people |
| Output (manufacturer data) | about 800 m²/day | about 800 m²/shift | about 800 m²/day | over 1,500 m²/day |
| Materials | Cement mortar, gypsum, polymer mortar, fireproof coatings | Cement mortar, premixed or site-mixed | Dry gypsum plaster, lightweight and heavy | Putty, primer, emulsion paint, water-based waterproofing |
Output and crew size are manufacturer data. We propose a specific configuration once we know your project.